RTX · November 2025 · public supplier portal
Updates to the November 2024 RTX Flowdown of U.S. Government Contract Clauses
Its 2 clauses can ask you for 8 things.
Something somebody else has to issue you2e.g. An assessment by an accredited third-party assessment organization 252.204-7021(d)(1)(i)
The same day if the issuer is one of your own suppliers, months if it is an assessor or an underwriter.
An assessment by an accredited third-party assessment organization
Owed when the value written at (d)(1)(i) is CMMC Level 2 (C3PAO). At CMMC Level 1 (Self) or Level 2 (Self) no outside assessor is owed, and Level 3 (DIBCAC) is assessed by the Government
252.204-7021(d)(1)(i)An affirmation of continuous compliance from each of your own suppliers, and a current certificate or status at the level their work calls for
Owed when you award a subcontract of your own that will process, store or transmit the information — both are due before that award rather than after it
252.204-7021(d)(4) and (f)(2)
A state you have to be in, in a government system3e.g. A current CMMC status at the level written into the order 252.204-7021(d)(1)(i)
The record has to be posted before the prime can see it, and posting is not the same day as being ready.
A current CMMC status at the level written into the order, or higher, held for the life of the work
Owed when for every information system used on the work that processes, stores or transmits the information — the level is the value the contracting officer wrote into the blank at (d)(1)(i)
252.204-7021(d)(1)(i)An affirmation of continuous compliance, completed each year in the Supplier Performance Risk System by a named affirming official
Owed when for each CMMC identifier covering a system used on the work, and it has to be current rather than merely on file
252.204-7021(d)(3)The results of a current self-assessment entered in that same system
Owed when each CMMC identifier not covered by a C3PAO assessment or a DIBCAC assessment
252.204-7021(e)(2)
Something you write3e.g. A value engineering change proposal for the construction work FAR 52.248-3(a)
Days to weeks, and nobody outside your company has to agree to it.
A value engineering change proposal for the construction work, developed, prepared and submitted voluntarily
FAR 52.248-3(a)An appropriate value engineering clause written into your own lower-tier subcontracts
Owed for a lower-tier subcontract of $90,000 or more; below that it may be included at your option
FAR 52.248-3(h)A plan of action and milestones carried through to a close
Owed when the status on record is Conditional rather than Final
252.204-7021(d)(5)
It names 2 FAR and DFARS clause numbersFold the clause list
- 52.248-3Value Engineering-Constructionflow-down required
- 252.204-7021Contractor Compliance With the Cybersecurity Maturity Model Certification Level Requirementsflow-down required
- 2
- the regulation requires the prime to flow down
- 0
- not required by the regulation. Still terms of your order.
Research, not legal advice. Also: this reads FAR and DFARS clause numbers. It reads nothing else in your document. What that leaves out
It says nothing about indemnity, insurance, limits of liability, governing law, payment terms, warranty terms, or the dates you owe the prime. None of that is FAR. None of it is ruled here. It is often the part that costs money.
Also from RTX
- RTX Standard Terms and Conditions of PurchaseProductno clause list
- RTX Flowdown of U.S. Government Contract Clauses Under U.S. Government Contracts233 clauses
- Raytheon TC-001General Terms and Conditions of Purchase51 clauses
- Raytheon TC-002Supplement 1: Government Contract Provisions from the FAR105 clauses
- Raytheon TC-003Supplement 2: Government Contract Provisions from the DFARS60 clauses