whatbindsCheck your order

RTX · 07/19 · public supplier portal

Raytheon TC-003 — Supplement 2: Government Contract Provisions from the DFARS

Its 60 clauses can ask you for 117 things.

  1. A program you have to be running14e.g. A purchasing process that goes to the original manufacturer or its authorized supplier first DFARS 252.246-7008(b)

    You are either running it or you are not, and what the prime asks for is the date it started.

    • The NIST SP 800-171 security requirements, in the version in effect when the solicitation was issued, running on every system of yours that holds or moves the covered information

      Owed when the system is your own — (b)(1) sends an information technology service operated on the Government's behalf to the contract's own terms instead

      252.204-7012(b)(2)(i)
    • A marking process and the equipment behind it, putting a MIL-STD-130 data matrix and human-readable text on every item the contract calls out

      DFARS 252.211-7003(c)
    • An estimating system that is reliable, consistently applied, and produces verifiable, supportable, documented and timely cost estimates

      DFARS 252.215-7002(b)
    Show 11 moreShow fewer
    • A plant run to DoD Manual 4145.26, the contractors' safety manual for ammunition and explosives — siting and quantity-distance, grounding, storage and training

      DFARS 252.223-7002(b)(1)
    • Physical security to DoD Manual 5100.76 for the listed arms, ammunition and explosives — approved storage, access control, inventory and controlled movement, as the statement of work specifies

      DFARS 252.223-7007(c)
    • Access controls that keep controlled technical data away from foreign persons, your own foreign employees included, and a license for anything that leaves the country

      DFARS 252.225-7048(b)
    • An earned value management system meeting the thirty-two ANSI/EIA-748 guidelines, producing timely, reliable and verifiable data for the contract performance report and the integrated master schedule

      DFARS 252.234-7002(b)
    • Administrative, technical and physical safeguards at the level the DoD Cloud Computing Security Requirements Guide sets

      Owed when cloud computing is used to provide information technology services in performing the order, unless the contracting officer notifies you that the DoD Chief Information Officer has waived it

      252.239-7010(b)(2)
    • Hosting that keeps Government data inside the United States or an outlying area

      Owed when the data is not physically located on DoD premises and no written notification from the contracting officer allows another location

      252.239-7010(b)(3)
    • A working practice for knowing who each information technology component came from, and being able to show that trail on demand

      DFARS 252.239-7018(b)
    • A material management and accounting system that forecasts material requirements, ties purchased and fabricated material cost to valid time-phased requirements, and costs material transactions on consistent, unbiased logic

      DFARS 252.242-7004(b)(1)
    • An acceptable property management system — records, receipt and identification, physical inventories, loss reporting, maintenance and disposition, to the criteria in FAR 52.245-1(b) and (f)

      DFARS 252.245-7003(b)
    • A documented counterfeit electronic part detection and avoidance program covering the twelve areas the clause lists — training, inspection and testing, traceability, quarantine, and reporting among them

      DFARS 252.246-7007(c)
    • A purchasing process that goes to the original manufacturer or its authorized supplier first, then to a supplier you have approved, and a documented route for the times neither is available

      DFARS 252.246-7008(b)
  2. Something somebody else has to issue you17e.g. Mill certificates giving the country of melt for every specialty metal incorporated in the item DFARS 252.225-7009

    The same day if the issuer is one of your own suppliers, months if it is an assessor or an underwriter.

    • The DoD fraud, waste and abuse hotline poster in effect at award — printed by the DoD Inspector General, displayed in the common work areas of the segments doing the work

      DFARS 252.203-7004(b)(1)(i)
    • The Homeland Security fraud hotline poster alongside it, printed by the DHS Inspector General

      Owed when the work is paid for in whole or in part with DHS disaster relief funds and performed in the United States

      DFARS 252.203-7004(b)(2)
    • A DoD-approved medium assurance certificate, bought from an outside certificate authority

      Owed when an incident has to be reported — the certificate is what the reporting channel authenticates against, so it is held before the incident rather than obtained after it

      252.204-7012(c)(3)
    Show 12 moreShow fewer
    • A cloud service provider meeting security requirements equivalent to the FedRAMP Moderate baseline, and complying with (c) through (g) on reporting and forensics

      Owed when covered information sits on a cloud service you did not build — the paragraph reaches an external provider only

      252.204-7012(b)(2)(ii)(D)
    • Country-of-origin statements from the suppliers of those components — the origin is fixed at their plant, and the prime asking for them sets what is enough

      DFARS 252.225-7001
    • A mill certificate naming the country where the metal was melted or produced, from the mill or the service center that sold it — evidence the prime weighs, not paper the clause names

      DFARS 252.225-7008
    • Mill certificates giving the country of melt for every specialty metal incorporated in the item, gathered back through the bill of material — evidence the prime weighs, not paper the clause names

      DFARS 252.225-7009
    • Origin statements for the fiber, yarn, fabric or food ingredient in what you supply, from whoever grew, spun, wove or processed it — evidence the prime weighs, not paper the clause names

      DFARS 252.225-7012
    • An origin declaration from the bearing maker or distributor covering where the bearing was manufactured and the cost share of its components — a datasheet does not say where the ring was forged, and the prime asking for it sets what is enough

      DFARS 252.225-7016
    • A letter of authorization generated from that system and signed by the contracting officer, which is what gets a person into theater and onto meals, transport and medical support

      DFARS 252.225-7040(c)
    • The preliminary personnel requirements (e) lists as one set — clearances, medical, dental and psychological fitness, required immunizations, theater-specific qualifications, passports and visas, and the training the paragraph names

      DFARS 252.225-7040(e)
    • An origin declaration from the supplier of each covered material — samarium-cobalt and neodymium-iron-boron magnets, tantalum, tungsten powder, and tungsten heavy alloy — naming where it was melted or produced, and the prime asking for it sets what is enough

      DFARS 252.225-7052
    • A license from the owner of any copyrighted material built into a deliverable, obtained for the Government, plus written approval and a statement of the license on the transmittal

      Owed when copyrighted material you do not own is going into technical data you will deliver

      252.227-7013(e)
    • A license from the owner of any copyrighted software or documentation you did not write, obtained for the Government before delivery

      Owed when third-party copyrighted software or documentation is going into what you will deliver

      252.227-7014(e)
    • A license from the owner of any third-party copyrighted data or software you are building in, obtained for the Government before delivery

      Owed when copyrighted material you do not own is going into a deliverable

      252.227-7018(e)

    and 2 more, each on its clause's page

  3. A state you have to be in, in a government system4e.g. Registration with the Department of State under the ITAR DFARS 252.225-7048(b)

    The record has to be posted before the prime can see it, and posting is not the same day as being ready.

    • An account in the Government's electronic submission system, with each item's record posted through it into the item unique identification registry

      DFARS 252.211-7003(f)
    • Every deployed person entered in the Synchronized Predeployment and Operational Tracker, with the record kept current for the whole deployment

      DFARS 252.225-7040(g)
    • Registration with the Department of State under the ITAR, which the clause names in its own words, for a shop that manufactures or exports defense articles

      DFARS 252.225-7048(b)
    Show 1 moreShow fewer
    • An authorized radio frequency allocation for the device, which is what lets it be tested or operated at all

      DFARS 252.235-7003(a)
  4. Something you write51e.g. Every drawing 252.227-7013(g)(1)

    Days to weeks, and nobody outside your company has to agree to it.

    • A subcontracting plan with separate dollar and percentage goals by category — small, veteran-owned, service-disabled veteran-owned, HUBZone, small disadvantaged and women-owned small business concerns — and the other items paragraph (d) enumerates

      FAR 52.219-9(d)
    • A written notice to employees, in the language most of the workforce speaks, of their whistleblower rights under 10 U.S.C. 4701

      DFARS 252.203-7002(a)
    • A written request naming the information, the medium and the purpose, filed with the buyer at least 10 business days before the planned release

      DFARS 252.204-7000(b)
    Show 12 moreShow fewer
    • A system security plan for each of those systems, and a plan of action for the requirements not yet in place

      Owed when the same systems (b)(2)(i) reaches — the plan and the plans of action are named by NIST SP 800-171 itself rather than by the clause's own words

      252.204-7012(b)(2)(i)
    • A written request to vary from a security requirement, for a DoD Chief Information Officer representative to adjudicate

      Owed when a NIST SP 800-171 requirement is not implemented and you are asking to vary from it

      252.204-7012(b)(2)(ii)(B)
    • A copy of an approval you already hold, provided when you ask for that earlier adjudication to be recognized on this order

      Owed when a DoD Chief Information Officer representative has already ruled that a requirement is not applicable to you, or that an alternative measure is equally effective

      252.204-7012(b)(2)(ii)(C)
    • A written disclosure of the estimating system to the administrative contracting officer

      Owed where paragraph (c) reaches you — it applies paragraphs (d) and (e) only to a large business meeting one of the two further tests in that paragraph

      DFARS 252.215-7002(d)(1)
    • A written request for exception in place of certified cost or pricing data

      DFARS 252.215-7010(b)(1)
    • Certified cost or pricing data and supporting attachments prepared in the FAR Table 15-2 format

      DFARS 252.215-7010(c)(1)
    • Uncertified cost data in the form your accounting regularly maintains it

      Owed where uncertified data is what the acquisition calls for, rather than certified data under paragraph (c)

      DFARS 252.215-7010(d)(2)
    • A written notice to the administrative contracting officer naming the firm that took the place of a small business named in the plan

      Owed when a small business concern named in the subcontracting plan is replaced by a firm that is other than small

      DFARS 252.219-7003(e)
    • A hazard warning label on the unit container of every hazardous item shipped, in the form the OSHA Hazard Communication Standard sets at 29 CFR 1910.1200

      DFARS 252.223-7001(b)
    • A copy of the hazard warning label itself, sent before award with the safety data sheet

      Owed by the apparently successful offeror, for every hazardous material not listed at (c)

      DFARS 252.223-7001(d)
    • Immediate notice to the contracting officer — the fastest clock in this clause

      Owed as soon as a mishap involving ammunition or explosives occurs

      DFARS 252.223-7002(d)(1)
    • A written report to the contracting officer, with the investigation (d)(2) requires behind it

      Owed after the same mishap, once the investigation the contract or the contracting officer calls for is under way

      DFARS 252.223-7002(d)(3)

    and 36 more, each on its clause's page

  5. Something you fill in and send back17e.g. A cyber incident report filed at dibnet.dod.mil within 72 hours of discovering the incident 252.204-7012(c)(1)(ii)

    Hours, once you know which one is missing.

    • The Individual Subcontract Report and the Summary Subcontract Report, filed through the electronic subcontracting reporting system

      FAR 52.219-9(d)(10)
    • A cyber incident report filed at dibnet.dod.mil within 72 hours of discovering the incident

      Owed when an incident affecting a covered system, the covered information on it, or your ability to perform the order is discovered

      252.204-7012(c)(1)(ii)
    • A Certificate of Current Cost or Pricing Data as prescribed by FAR 15.406-2

      DFARS 252.215-7010(c)(2)
    Show 12 moreShow fewer
    • The Individual Subcontract Report and the Summary Subcontract Report, filed through the electronic subcontracting reporting system

      DFARS 252.219-7003(f)
    • The list, filled in at offer, of which hazardous materials will instead be labeled under the pesticide, food and drug, consumer product, hazardous substances or alcohol statutes

      DFARS 252.223-7001(c)
    • The place of performance for all ammunition and explosives work, written into the Place of Performance provision at offer

      DFARS 252.223-7003(a)
    • The customs entry forms, completed and submitted to the District Director of Customs with a copy to the DCMA St. Louis Duty Free Entry Team, which executes the duty-free entry certificates

      Owed when the shipment is not consigned directly to a military installation — those are released under sections 10.101 and 10.102 of the Customs regulations instead

      DFARS 252.225-7013(f)(1)(i)
    • A request for the incentive payment, 5 percent of the estimated cost, target cost or fixed price of the subcontract

      Owed when you place a subcontract with an Indian organization, an Indian-owned economic enterprise or a Native Hawaiian small business concern, and program funds are available

      DFARS 252.226-7001(f)
    • A written representation of eligibility, which the buyer may rely on in good faith unless an interested party challenges the status

      Owed when you are yourself an Indian organization, an Indian-owned economic enterprise or a Native Hawaiian small business concern

      DFARS 252.226-7001(c)
    • The attachment listing the technical data you will hand over with restrictions on it

      Owed when you intend to deliver technical data with a restrictive marking — nothing may be delivered marked unless it is on that list, and (f)(3) is the route for an assertion found after award

      252.227-7013(f)(2)
    • The attachment listing the software and documentation you will hand over with restrictions on it

      Owed when you intend to deliver software with a restrictive marking — nothing may be delivered marked unless it is on that list

      252.227-7014(f)(2)
    • The assertions table, signed by someone who can bind the company: what will be delivered with restrictions, the basis for each, the rights category asserted and who is asserting it — your suppliers' assertions as well as your own

      Owed when the contract will require delivery of technical data or software with less than unlimited rights, to the extent known when the offer goes in

      252.227-7017(d)
    • The attachment identifying what will be delivered with restrictions on use, release or disclosure

      Owed when you intend to deliver with a restrictive marking — nothing carries a marking it is not listed for

      252.227-7018(f)
    • The nondisclosure agreement at DFARS 227.7103-7, completed and signed before the marked data reaches them

      Owed when you pass Government-furnished data carrying a government purpose rights legend, or a specially negotiated legend under (b)(3), to a supplier or prospective supplier

      252.227-7025(b)(2)
    • An attachment to the offer identifying that data — the contract it was produced under, who received it most recently, and the limits on the Government's rights, including the earliest date any limitation expires

      Owed when you intend to deliver data or software with less than unlimited rights that is identical or substantially similar to something already produced for or delivered to the Government

      DFARS 252.227-7028

    and 2 more, each on its clause's page

  6. Nothing to send now14They are terms that decide what money moves later, rules you follow while you work or numbers with no text behind them.
It names 60 FAR and DFARS clause numbersFold the clause list
  1. 52.219-9Small Business Subcontracting Planflow-down required
  2. 252.203-7001Prohibition on Persons Convicted of Fraud or Other Defense Contract-Related Feloniesflow-down required
  3. 252.203-7002Requirement to Inform Employees of Whistleblower Rightsflow-down required
  4. 252.203-7004Display of Hotline Postersflow-down required
  5. 252.204-7000Disclosure of Informationflow-down required
  6. 252.204-7012Safeguarding Covered Defense Information and Cyber Incident Reportingflow-down required
  7. 252.204-7015Notice of Authorized Disclosure of Information for Litigation Supportflow-down required
  8. 252.211-7000Reserved. [formerly: Acquisition Streamlining]no mandate
  9. 252.211-7003Item Unique Identification and Valuationflow-down required
  10. 252.215-7002Cost Estimating System Requirementsno mandate
  11. 252.215-7010Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Datano mandate
  12. 252.219-7003Small Business Subcontracting Plan (DoD Contracts)no mandate
  13. 252.222-7006Restrictions on the Use of Mandatory Arbitration Agreementsflow-down required
  14. 252.223-7001Hazard Warning Labelsno mandate
  15. 252.223-7002Safety Precautions for Ammunition and Explosivesflow-down required
  16. 252.223-7003Change in Place of Performance—Ammunition and Explosivesno mandate
  17. 252.223-7007Safeguarding Sensitive Conventional Arms, Ammunition, and Explosivesflow-down required
  18. 252.223-7008Prohibition of Hexavalent Chromiumflow-down required
  19. 252.225-7001Buy American and Balance of Payments Programno mandate
  20. 252.225-7007Prohibition on Acquisition of Certain Items from Communist Chinese Military Companiesflow-down required
  21. 252.225-7008Restriction on Acquisition of Specialty Metalsno mandate
  22. 252.225-7009Restriction on Acquisition of Certain Articles Containing Specialty Metalsflow-down required
  23. 252.225-7012Preference for Certain Domestic Commoditiesno mandate
  24. 252.225-7013Duty-Free Entryflow-down required
  25. 252.225-7016Restriction on Acquisition of Ball and Roller Bearingsflow-down required
  26. 252.225-7033Waiver of United Kingdom Leviesflow-down required
  27. 252.225-7040Contractor Personnel Supporting U.S. Armed Forces Deployed Outside the United Statesflow-down required
  28. 252.225-7048Export-Controlled Itemsflow-down required
  29. 252.225-7052Restriction on the Acquisition of Certain Magnets, Tantalum, and Tungstenflow-down required
  30. 252.226-7001Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concernsflow-down required
  31. 252.227-7013Rights in Technical Data—Other Than Commercial Products and Commercial Servicesflow-down required
  32. 252.227-7014Rights in Other Than Commercial Computer Software and Other Than Commercial Computer Software Documentationflow-down required
  33. 252.227-7015Technical Data—Commercial Products and Commercial Servicesflow-down required
  34. 252.227-7016Rights in Bid or Proposal Informationflow-down required
  35. 252.227-7017Identification and Assertion of Use, Release, or Disclosure Restrictionsno mandate
  36. 252.227-7018Rights in Other Than Commercial Technical Data and Computer Software—Small Business Innovation Research Program and Small Business Technology Transfer Programflow-down required
  37. 252.227-7019Validation of Asserted Restrictions—Computer Softwareflow-down required
  38. 252.227-7025Limitations on the Use or Disclosure of Government-Furnished Information Marked with Restrictive Legendsno mandate
  39. 252.227-7026Deferred Delivery of Technical Data or Computer Softwareno mandate
  40. 252.227-7027Deferred Ordering of Technical Data or Computer Softwareno mandate
  41. 252.227-7028Technical Data or Computer Software Previously Delivered to the Governmentno mandate
  42. 252.227-7037Validation of Asserted Restrictions on Technical Dataflow-down required
  43. 252.227-7038Patent Rights—Ownership by the Contractor (Large Business)flow-down required
  44. 252.228-7005Mishap Reporting and Investigation Involving Aircraft, Missiles, and Space Launch Vehiclesflow-down required
  45. 252.231-7000Supplemental Cost Principlesno mandate
  46. 252.234-7002Earned Value Management Systemflow-down required
  47. 252.235-7003Frequency Authorizationflow-down required
  48. 252.239-7010Cloud Computing Servicesflow-down required
  49. 252.239-7018Supply Chain Riskno mandate
  50. 252.242-7004Material Management and Accounting Systemno mandate
  51. 252.242-7005any loss, damage, or expense including without limitation any withholds under 252.242-7005not in the base
  52. 252.242-7006“Material Management and Accounting System”, 252.242-7006 “Accounting System Administration”,not in the base
  53. 252.244-7000Subcontracts for Commercial Products or Commercial Servicesflow-down required
  54. 252.244-7001Contractor Purchasing System Administrationno mandate
  55. 252.245-7003Contractor Property Management System Administrationno mandate
  56. 252.246-7003Notification of Potential Safety Issuesflow-down required
  57. 252.246-7007Contractor Counterfeit Electronic Part Detection and Avoidance Systemflow-down required
  58. 252.246-7008Sources of Electronic Partsflow-down required
  59. 252.247-7023Transportation of Supplies by Seaflow-down required
  60. 252.249-7002Notification of Anticipated Contract Termination or Reductionflow-down required
39
the regulation requires the prime to flow down
19
not required by the regulation. Still terms of your order.
2
not in the base
Research, not legal advice. Also: this reads FAR and DFARS clause numbers. It reads nothing else in your document. What that leaves out

It says nothing about indemnity, insurance, limits of liability, governing law, payment terms, warranty terms, or the dates you owe the prime. None of that is FAR. None of it is ruled here. It is often the part that costs money.

Also from RTX

Research, not legal advice. It does not rule on whether RTX's markings are correct, and a clause with no flow-down mandate in the regulation is still a contract term once it is in your subcontract.

read from txt/raytheon-tc003-dfars-supplement.txt @ 2ea3aa997235