DFARS 252.227-7026 Deferred Delivery of Technical Data or Computer Software
Does the regulation require it to flow down?
No
No paragraph mandating inclusion in subcontracts, but the text expressly covers data 'required to be prepared by a subcontractor' — the prime mirrors the clause in the sub (back-to-back) because, without it, it owes the government for 2 years a data item it has no way to demand from the sub.
A clause can reach your subcontract without a mandate. Once it is in your document, it is a contract term all the same. The missing mandate is a fact about the regulation. It is not a ruling on your order.
Checked against acquisition.gov on 2026-08-11 · edition APR 1988 · base v0.9.3 Read the text ↗
What it makes you produce
One item for your checklist.
Something you write
Days to weeks, and nobody outside your company has to agree to it.
- DFARS 252.227-7026
The data or software items marked deferred delivery in the order
Owed when the Government calls for them — at any time during performance and up to two years after acceptance of everything else or termination, whichever is later
When it is used
Prescribed at 227.7103-8(a): the contract identifies data/software to be delivered but marks items as 'deferred delivery'. The government can order delivery up to 2 years after acceptance of all items (other than data/software) or contract termination, whichever is later. For data prepared by a subcontractor, the prime's obligation expires 2 years after it accepts the sub's last delivery of that item.
Read closely
Nothing is due on signature; what the clause costs is keeping those files retrievable and deliverable for the whole window. Where the item was prepared by a supplier of yours, the window runs two years from your acceptance of that supplier's last delivery.
The 13 templates that name it, with the line
Source: acquisition.gov, DFARS 252.227-7026. CODIFIED REGIME, read 2026-08-11 on the part-252 page at DFARS Change 5/7/2026: "As prescribed in 227.7103-8(a), use the following clause:" with designation (APR 1988). DEVIATION REGIME, read 2026-08-11 in acquisition.gov/sites/default/files/page_file_uploads/DoD_RFO_Deviation_Part-27.pdf (1125972 bytes, 117 pages, DARS Tracking Number 2026-O0036, "Effective February 1, 2026, contracting officers shall use"): the memo prints "252.227-7026 [Reserved]" and rewrites 227.7103-8 as "Deferred ordering of technical data", directing a reader to "the clause at 252.227-7995, Deferred Ordering of Technical Data or Computer Software", which the memo prescribes at 227.7103-6(h) and designates (DEVIATION 2026-O0036). The codified 252.227-7027, Deferred Ordering, appears in the memo zero times. THE REGIMES DIVERGE AND THE DIVERGENCE IS THE WHOLE ANSWER: the deferred-DELIVERY clause this entry is about is alive codified and RESERVED under the deviation, and the deferred-ORDERING pair 252.227-7027 is replaced by 252.227-7995. A sub holding a document that cites 252.227-7026 and a DoD contracting officer applying the deviation are not looking at the same instrument. Whether this entry's verdict moves is a ruling and is left to one. TO RE-DERIVE WITHOUT REDOING THE RESEARCH: fetch that PDF, run pdftotext -layout over it, and grep for 252.227-7026 — 1 occurrences on 2026-08-11, poppler pdftotext. (verified 2026-08-11)