Clauses · DFARS · Supply chain and sourcing
DFARS 252.225-7048 Export-Controlled Items
Does the regulation require it to flow down?
Yes
All subcontracts
- Form
- substance
- Reaches
- all tiers
Checked against acquisition.gov on 2026-08-09 · edition JUNE 2013 · base v0.9.3 Read the text ↗
What it makes you produce
2 items for your checklist, slowest first.
A program you have to be running
You are either running it or you are not, and what the prime asks for is the date it started.
Access controls that keep controlled technical data away from foreign persons, your own foreign employees included, and a license for anything that leaves the country
DFARS 252.225-7048(b)
A state you have to be in, in a government system
The record has to be posted before the prime can see it, and posting is not the same day as being ready.
Registration with the Department of State under the ITAR, which the clause names in its own words, for a shop that manufactures or exports defense articles
DFARS 252.225-7048(b)
When it is used
All DoD contracts; no threshold.
Read closely
(b) is a single sentence — comply with the export laws, including the registration requirement — and (c) says that responsibility does not shift because of what anyone else told you. The weight sits in the regulations the clause points at rather than in its own text, which is what makes a foreign operation the sensitive fact on this row.
The 18 templates that name it, with the line
Source: acquisition.gov, DFARS 252.225-7048, codified text read at DFARS Change 5/7/2026, prescribed at 225.7901-4 with designation (JUNE 2013); RFO class deviation 2026-O0041 (DFARS part 225, effective 2026-02-17) prints the same prescription and the same designation, so the two regimes agree (verified 2026-08-09)
This is research, not legal advice. It states what the regulation says about this clause and cites the paragraph behind it. It does not rule on your order, and it does not rule on whether a prime's markings are correct.